Trade Specifications

tagged "Painting and Decorating"

The following Trade Specifications must be read in conjunction with all other Contract documentation including; Tender Letter, General Terms, Conditions of Contract for Works, Labour Only and Purchase Orders, General Construction Notes (England & Wales), Suppliers and Sub Contract Works - Customer Charter and the Company's Occupational Safety, Health & Environmental Management System.

Our aim is to enable our sub-contractors and suppliers to access key Commercial information such as Terms & Conditions, Trade Specification, etc. online as soon as they are updated and revised. We hope that this will ensure that our supply chain is always fully informed as quickly as possible.

Whilst available online, this information is also available from the Commercial Departments at our Divisional offices and will form part of any contract we place (as set out in the Order).

Please be aware that bogus web sites seeking fees for the chance of working with major contractors exist.

Jon Hayward
Senior Group Commercial Manager

Painting and Decorating

Revision T 01.07.2018

Recycling section has had a Dulux web link added and wording within recycling amended and colour for walls have been amended.

Revision S 01.01.2018

3.6 Rewording - External work is not carried out in adverse weather conditions. No work shall be carried out below 5 degrees C. (solvent borne) or 8 degrees C. (water borne) or when the humidity exceeds 80%. All work shall be protected against frost.

4.2 additional wording - Where additional filling is required after the application of the mist coat this must be brought forward with a thinned coat of Dulux Trade Supermatt prior to the application of finishing coats. This reduces filler flash through.

Revision R 01.07.2017

Product codes/names have changed.

Revision Q 01.10.2016

Within the Preparation of Painting Surfaces, Section 4.1, the requirements for painting internal doors has been updated following
the changes to the Group Commodity Agreement for procurement of either primed finish doors or pre-finished doors; door treatment is to be advised by the Surveyor at tender stage to allow the appropriate allowance to be provided as part of the quotation.

Within section 4.2 Plastered Surfaces, the painting upgrade options for Gold and Diamond finish have been removed as is now one standard finish specified.

  • Fire Protection (PDF, 627 Kb)

    Barratt / David Wilson Homes Standard Drawing DB-SD09-19