The following Trade Specifications must be read in conjunction with all other Contract documentation including; Tender Letter, Operating Procedures for All Contractors, Conditions of Contract for Works, Labour Only and Purchase Orders, General Construction Notes (England & Wales), Suppliers and Sub Contract Works - SLA and the Company's Occupational Safety, Health & Environmental Management System.

Our aim is to enable our sub-contractors and suppliers to access key Commercial information such as Terms & Conditions, Trade Specification, etc. online as soon as they are updated and revised. We hope that this will ensure that our supply chain is always fully informed as quickly as possible.

Whilst available online, this information is also available from the Commercial Departments at our Divisional offices and will form part of any contract we place (as set out in the Order).

Please be aware that bogus web sites seeking fees for the chance of working with major contractors exist.

Jon Hayward
Commercial Director (Group)

tagged "Electrical"

Electrical

Rev AS - 01.01.2024

General section has been updated to request that the Electrical Contractor works in conjunction with the Plumbing Contractor to ensure the wiring locations are appropriate and all necessary connections are completed for all items supplied and installed by the Plumbing and Heating Contractor requiring connection to either mains power or to data points. Additionally, where condensation traps and drain are to be installed by the Electrical Contractor to the ventilation duct, in readiness for the Plumbing Contractor to connect the drain to the SVP.

Changes have been made to the installation of Virgin Media O2 fibre.

Sections 16 and 17 have been combined into one, Mechanical Extract Ventilation. The section has been fully updated to 2021 Building Regulations. Product codes have also been updated, for ordering by the Contractor, in the schedule of materials section.

Smoke Alarms, this section has been amended with the addition of mains powered combined smoke and heat alarms must be installed in roof spaces where Solar PV, inverters, batteries, or boilers are installed.

Minor changes have been made to the requirements to remove waste from plots to the waste segregation area and deposited into the appropriate skip, this also includes a contra-charge provision if not completed satisfactorily.

Electrical Downlighter Installation

Barratt / David Wilson Homes Standard Drawing DB-SD09-003