The following Trade Specifications must be read in conjunction with all other Contract documentation including; Tender Letter, General Terms, Conditions of Contract for Works, Labour Only and Purchase Orders, General Construction Notes (England & Wales), Suppliers and Sub Contract Works - Customer Charter and the Company's Occupational Safety, Health & Environmental Management System.

Our aim is to enable our sub-contractors and suppliers to access key Commercial information such as Terms & Conditions, Trade Specification, etc. online as soon as they are updated and revised. We hope that this will ensure that our supply chain is always fully informed as quickly as possible.

Whilst available online, this information is also available from the Commercial Departments at our Divisional offices and will form part of any contract we place (as set out in the Order).

Please be aware that bogus web sites seeking fees for the chance of working with major contractors exist.

Jon Hayward
Senior Group Commercial Manager

Electrical

Revision AJ 01.01.2019

This document has been subject to review due to the new I.E.T regulations 18th edition, which will be subject to for any new electrical installations designed (tendered) from the 1st of January 2019.

Removal of equipotential bonding requirements.

Group Supplier information has been updated for Door Entry Systems.

Material Schedules have been updated with revised product codes for Hagar consumer units. The Contractor to assess whether surge protection is required based on the plot's location in the country (using a lightning strike rate map) plus a rural and suburban / urban factor in accordance with I.E.T. regulations 18th edition.

Removal of door chimes / bells to all ranges from the material schedule.

Addition of Deta carbon dioxide detectors (Scotland only)

Revision AI 01.07.2018

Fire protection within the specification has been reviewed.

Section 20 has been newly added.

An update of smoke alarm product reference numbers have been amended.

Revision AH 01.01.2018

15.3 Rewording - Kitchen (Where no hood extract)

Fans in this location must be capable of giving extraction at a rate not less than 60 litres/second extraction, ducted to outside through sleeve, duct should be built in brickwork as work proceeds or 30l/s if the fan is placed over the hob.

15.4 Addition - Were the fan is ducted to a roof tile vent the EnviroVent condensation kit must be used, flexible ducting to be pulled taught and to be kept to a minimum as per the domestic ventilation compliance guide.

15.5 Addition - Were a utility fan is ducted to a roof tile vent the EnviroVent condensation kit must be used, flexible ducting to be pulled taught and to be kept to a minimum as per the domestic ventilation compliance guide.

15.8 New - All of the above equipment to be manufactured by Envirovent.

Schedule of materials updated accordingly 3 revised product numbers.

Revision AG 01.07.2017

Changes to product codes/names have changed.

Electrical Downlighter Installation

Barratt / David Wilson Homes Standard Drawing DB-SD09-003

  • Fire Protection (PDF, 627 Kb)

    Barratt / David Wilson Homes Standard Drawing DB-SD09-19